Transformer Internal Inspection — PD Root Cause Analysis

ElectroCore Arabia conducted a comprehensive internal inspection of a power transformer at our Dammam workshop to identify and resolve the root cause of elevated partial discharge (PD) levels detected during routine testing. The project involved complete disassembly, detailed visual and dimensional inspection of all windings and insulation systems, and root cause determination with corrective recommendations.